Shopping cart

    Subtotal

    View cartCheckout

    Integration & Validation
    WP7 (M4-M24)

    Integration & Validation

    CoordinatorThe French Alternative Energies and Atomic Energy Commission (CEA)

    Participants – NIC, TLB, FHG, IMT, CSI, EHT, NRD, VMU​

    WP7 is responsible of the integration and validation of WP4, WP5 and WP6 development. The tools will be integrated together and validation will be run through simulation.

    The following tasks are set:

    • Task 7.1 Integration Environment Specification is responsible for specifying the complete integration environment.
    • Task 7.2 Cyber-range installation/configuration and IT simulation is responsible for deployment and configuration of three simulated IT architectures in a cyber-range.
    • Task 7.3 WP4 prototype integration/validation is responsible for deployment of WP4 deliverables in the three simulated environments, thus simulating three collaborative SOCs. One SOC will be fully IDMEFv2 compatible and two SOCs will use legacy tools with a gateway.
    • Task 7.4 WP6 deliverables integration/validation is responsible of deployment and configuration of WP6 OSS tools and connecting them to the SOCs.
    • Task 7.5 WP5 deliverables integration/validation is responsible for deployment and tuning of the AI engines developed in WP5.
    • Task 7.6 Traffic/Attacks/ Incidents Simulation is responsible when all tools will be deployed to simulate incidents, intrusions, attacks and sharing of alerts between the two simulated SOCs.

    Deliverables:

      • 1 Integration SPEC – M6
      • 2 Integration REX – M24